Lean Six Sigma · DMAIC · Statistics · Control Charts · Hypothesis Testing · Lean
60 questions · 120 min · 70% Techclick practice target
⚠️ Exam Rules
| Questions in this Techclick bank | 60 |
|---|---|
| Timer | 120 min |
| Techclick practice target | 70% |
| Official exam code | LSSGB |
A Green Belt is drafting the project charter for a billing-defect reduction effort. The sponsor keeps adding new objectives mid-project, and the timeline keeps slipping. Which element of the charter is the BEST tool to bring this under control?
Correct: A. Scope creep is controlled by an explicit, agreed scope statement in the charter that names what is in and out of bounds, so new requests are evaluated against it. Adding people (B) is the classic misconception — it does not stop creep and often slows things (Brooks' law). A bigger savings target (C) is a goal, not a boundary. A control plan (D) belongs in the Control phase, after the solution exists.
During Define, a Green Belt interviews customers and captures statements like "I never know when my order will arrive." This is an example of the Voice of the Customer. What is the correct NEXT step to make it usable for the project?
Correct: A. Raw VOC is qualitative and must be translated into specific, measurable CTQs (e.g., order-status accuracy within +/- 1 day) before it can drive measurement. Using the raw statement as the metric (B) or operational definition (D) skips the translation and leaves it unmeasurable. Discarding it (C) ignores valid customer needs.
A team builds a SIPOC for an order-fulfillment process. A member wants to add a 14-page step-by-step process map into the SIPOC. What is the BEST guidance for the level of detail in a SIPOC?
Correct: A. A SIPOC is a high-level scoping tool that frames Suppliers-Inputs-Process-Outputs-Customers in about 4-7 macro steps. Forcing full detail (B) defeats its purpose and duplicates detailed mapping done in Measure. Omitting the process (C) breaks the tool, and capability data (D) is a Measure-phase output, not a SIPOC field.
A Green Belt classifies project stakeholders. The plant manager controls the budget and can halt the project, but is currently only mildly interested. On a power/interest grid, how should this stakeholder be managed?
Correct: A. High power + low interest sits in the "keep satisfied" quadrant: their authority can make or break the project, so they must be kept content, but they do not want day-to-day detail. Treating them as "monitor only" (B) ignores their power — the trap of equating low interest with low importance. They are not the active champion (C), and flooding them with reports (D) risks alienating a busy executive.
Using the Kano model, a hotel guest expects clean sheets — its presence causes no delight but its absence causes strong dissatisfaction. How is this requirement classified, and what does it imply for the project?
Correct: A. Must-be (basic) needs are taken for granted; meeting them only prevents dissatisfaction and over-delivering adds no delight. The common trap is calling clean sheets a delighter (B) — delighters are unexpected extras. Performance needs (C) scale linearly with delivery, and indifferent needs (D) move satisfaction neither way.
Last updated:
Yes. You can start, finish and score it for free, and download the Techclick practice certificate.
This bank has 60 original scenario-based questions with a 120-minute timer and a 70% Techclick practice target.
LSSGB is the label Techclick uses for this practice set. Check the official Six Sigma certification page for the current exam code.
No. They are original practice questions written by Techclick. This is not the vendor's official exam and not leaked dumps.
Score 70% or higher to get a Techclick practice certificate and LinkedIn badge. It is not an official Six Sigma certification.
Use the Six Sigma practice exams page (linked above) to pick the next practice test in the same track.

You earned it — let the world know!
